Date of Report (Date of earliest event reported): April 4, 2008

TRANSOCEAN INC.

(Exact name of registrant as specified in its charter)

 

Cayman Islands   333-75899   66-0582307

(State or other jurisdiction of

incorporation or organization)

 

(Commission

File Number)

 

(I.R.S. Employer

Identification No.)

 

4 Greenway Plaza  
Houston, Texas   77046
(Address of principal executive offices)   (Zip code)

 

70 Harbour Drive

 

Grand Cayman, Cayman Islands

 

KYI-1003

(Address of principal executive offices)   (Zip code)

Registrant’s telephone number, including area code: (713) 232-7500

(Former name or former address, if changed since last report)

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):

 

  ¨ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

 

  ¨ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

 

  ¨ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

 

  ¨ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

 

 


Item 7.01 Regulation FD Disclosure

We issue a report entitled “Transocean Fleet Status Report”, which includes drilling rig status and contract information, including contract dayrate and duration. A report dated April 4, 2008 is furnished as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated herein by reference. You may also subscribe to the free Transocean Financial Report Alert which will alert you to new Transocean Fleet Status Reports. This service will send you an automated email which will provide a link directly to the web page containing the updated report. You may subscribe to this service at the “Investor Relations/Email Alerts” section of the site by selecting “Receive E-mail” and providing your email address. Our website may be found at www.deepwater.com.

Item 9.01. Financial Statements and Exhibits

(d) Exhibits.

The exhibit to this report furnished pursuant to item 7.01 is as follows:

 

Exhibit No.

  

Description

99.1    Transocean Inc. Fleet Status Report

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

    TRANSOCEAN INC.
Date: April 4, 2008     By   /s/ Eric B. Brown
     

Eric B. Brown

     

Senior Vice President, General Counsel and Assistant Corporate Secretary


Index to Exhibits

 

Exhibit

Number

  

Description

99.1    Transocean Inc. Fleet Status Report
Transocean Inc. Fleet Status Report

Exhibit 99.1

 

LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

The information contained in this Fleet Update report (the “Information”) is as of the date of the report only and is subject to change without notice to the recipient. Transocean Inc. assumes no duty to update any portion of the Information.

DISCLAIMER. NEITHER TRANSOCEAN INC. NOR ITS AFFILIATES MAKE ANY EXPRESS OR IMPLIED WARRANTIES (INCLUDING, WITHOUT LIMITATION, ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE) REGARDING THE INFORMATION CONTAINED IN THIS REPORT, WHICH INFORMATION IS PROVIDED “AS IS.” Neither Transocean Inc. nor its affiliates will be liable to any recipient or anyone else for any inaccuracy, error or omission, regardless of cause, in the information set forth in this report or for any damages (whether direct or indirect, consequential, punitive or exemplary) resulting therefrom.

No Unauthorized Publication or Use. All information provided by Transocean Inc. in this report is given for the exclusive use of the recipient and may not be published, redistributed or retransmitted without the prior written consent of Transocean Inc.

Client Contract Duration, Timing and Dayrates and Risks Associated with Operations. The duration and timing (including both starting and ending dates) of the client contracts are estimates only, and client contracts are subject to cancellation, suspension and delays for a variety of reasons, including some beyond the control of Transocean Inc. Also, the dayrates set forth in the report are estimates based upon the full contractual operating dayrate. However, the actual average dayrate earned over the course of any given contract will be lower and could be substantially lower. The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond the control of Transocean Inc. Our client contracts and operations are generally subject to a number of risks and uncertainties, and we urge you to review the description and explanation of such risks and uncertainties in our filings with the Securities and Exchange Commission (SEC), which are available free of charge on the SEC’s website at www.sec.gov. The dayrates do not include revenue for mobilizations, demobilizations, upgrades, shipyards or recharges.

Out of Service Days (Shipyards, Mobilizations, Etc.). Estimated out of service time for 2008 is noted where the company anticipates that a rig will be out of service and not be available to earn an operating dayrate for a period of 14 days or longer. Additional rig out of service time in 2008 may occur and will be added to the report as such events arise. No estimates are made for 2009 and beyond.

Out of service time is denoted as “Mob/Contract Prep” and “Shipyard or Project” out of service days. Mob/Contract Prep refers to periods during which the rig is being mobilized, demobilized and/or modifications or upgrades are being made as a result of contract requirements. Shipyard or Project refers to periods during which the rig is out of service as a result of other planned shipyards, surveys, repairs, regulatory inspections or other planned service or work on the rig. Similar Mob/Contract Prep and Shipyard or Project periods of durations under 14 days will occur but are not noted in the Update. In some instances such as certain mobilizations, demobilizations, upgrades and shipyards, we are paid compensation by our clients that is generally recognized over the life of the underlying contract, although such compensation is not typically significant in relation to the revenue generated by the dayrates we charge our clients.

Forward-Looking Statement. The statements made in the Fleet Update that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements made in the Fleet Update include, but are not limited to, statements involving the estimated duration of client contracts and commitments contract dayrate amounts, future contract commencement dates and locations and planned shipyard projects and other out of service time. Such statements are subject to numerous risks, uncertainties and assumptions, including but not limited to, uncertainties relating to the level of activity in offshore oil and gas exploration and development, exploration success by producers, oil and gas prices, competition and market conditions in the contract drilling industry, shipyard delays, actions and approvals of third parties, possible cancellation or suspension of drilling contracts as a result of mechanical difficulties or performance, the Company’s ability to enter into and the terms of future contracts, the availability of qualified personnel, labor relations and the outcome of negotiations with unions representing workers, operating hazards, factors affecting the duration of contracts including well-in-progress provisions, the actual amount of downtime, factors resulting in reduced applicable dayrates, hurricanes and other weather conditions, terrorism, political and other uncertainties inherent in non-U.S. operations (including the risk of war, civil disturbance, seizure or damage of equipment and exchange and currency fluctuations), the impact of governmental laws and regulations, the adequacy of sources of liquidity, the effect of litigation and contingencies and other factors described above and discussed in the Company’s most recently filed Form 10-K, in the Company’s Forms 10-Q for subsequent periods and in the Company’s other filings with the SEC, which are available free of charge on the SEC’s website at www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those indicated. You should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to publicly update or revise any forward looking statements.

Fleet Classification. Transocean Inc. uses a rig classification for its semisubmersible rigs and drillships to reflect the company’s strategic focus on the ownership and operation of premium, high specification floating rigs. The rig classification “High Specification Floaters” is comprised of “Ultra-Deepwater” which refers to the latest generation of semisubmersible rigs and drillships possessing the latest technical drilling capabilities and the ability to operate in water depths equal to or greater than 7,500 feet, “Deepwater” which refers to semisubmersible rigs and drillships that possess the ability to drill in water depths equal to or greater than 4,500 feet, and “Harsh Environment” comprised of five of the company’s premium harsh environment rigs, the semisubmersibles Henry Goodrich, Transocean Leader, Paul B. Loyd, Jr., Transocean Arctic and Polar Pioneer. The category titled “Midwater Floaters” represents semisubmersible rigs and drillships that possess the ability to drill in water depths of up to 4,499 feet. The jackup fleet is subdivided into two categories;”High Specification” which consists of harsh environment and high performance jackups and “Standard”.

 

Page 1


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned «

 

Rig Type/Name    Floater
Type
         Yr. (1)
Entered
Service
   Water
Depth
(Feet)
   Drilling
Depth
(Feet)
   Location    Client   

Current

Contract

Start/Idle Date

  

Estimated
Expiration

/Out of

Service (2)

  

Current

Contract

Dayrate (3)

(Dollars)

   

Previous

Contract

Dayrate (3)

(Dollars)

Rigs Under Construction (8)

                                             

Discoverer Clear
Leader (15)

   Ship    «      TBA    12,000    40,000    USGOM    Chevron    See Footnote 4    See Footnote 4    See Footnote 4     N/A

Discoverer
Americas (15)

   ship    «      TBA    12,000    40,000    USGOM    StatoilHydro    See Footnote 5    See Footnote 5    475,000     N/A

Discoverer
Inspiration (15)

   ship    «      TBA    12,000    40,000    USGOM    Chevron    See Footnote 6    See Footnote 6    472,000     N/A

GSF Drillship TBN 1

   ship    «      TBA    12,000    40,000    TBA    TBA    See Footnote 7    See Footnote 7    See Footnote 7     N/A

Deepwater Pacific 1

   ship    «      TBA    12,000    35,000    India    Reliance    See Footnote 8    See Footnote 8    See Footnote 8     N/A

Deepwater Pacific 2

   ship    «      TBA    10,000    35,000    TBA    TBA    See Footnote 9    See Footnote 9    See Footnote 9     N/A
Discoverer Luanda    ship    «      TBA    7,500    40,000    Angola    BP    See Footnote 10    See Footnote 10    See Footnote 10     N/A

GSF Development
Driller III (15)

   semi    «      TBA    7,500    30,000    Angola    BP    See Footnote 11    See Footnote 11    382,000     N/A

High Specification Floaters:

                                             

Ultra-Deepwater (18)

                                                         

Discoverer Deep
Seas (15)

   ship    «      2001    10,000    35,000    USGOM    Chevron    Jan-08    Jan-09    318,000     294,000
                        Jun-08   

14 days Shipyard

or Project

    
                  USGOM    Chevron    Jan-09    Jan-11    485,000     318,000

Discoverer
Enterprise (15)

   ship    «      1999    10,000    35,000    USGOM    BP    Dec-07    Dec-10    520,000     191,000

Discoverer Spirit (15)

   ship    «      2000    10,000    35,000    USGOM    Anadarko    Dec-07    Dec-10    497,000     298,000
                  USGOM    Anadarko    Dec-10    Dec-13    520,000     497,000

GSF C.R. Luigs (15)

   ship    «      2000    10,000    35,000    USGOM    BHP Billiton    Sep-07    Sep-09    393,000     225,000
                  USGOM    BHP Billiton    Sep-09    Oct-13    510,000     393,000

GSF Jack Ryan (15)

   ship    «      2000    10,000    35,000    Nigeria    Total    Jun-07    Jun-09    297,000     270,000
                  Nigeria    Total    Jun-09    Jul-13    425,000     297,000

Deepwater
Discovery

   ship    «      2000    10,000    30,000    Nigeria    Total    Mar-07    Aug-08    368,000     357,000
                  Brazil    Devon    Aug-08    Jan-14    425,000 (14)   368,000

Deepwater Frontier

   ship    «      1999    10,000    30,000    India    Reliance    Aug-06    Aug-08    320,000     145,000
                  India    Reliance    Aug-08    Sep-11    477,000     320,000

Deepwater
Millennium (15)

   ship    «      1999    10,000    30,000    USGOM    Anadarko    Jun-07    Jul-10    447,000     302,000
                  USGOM    Anadarko    Jul-10    Jul-13    535,000     447,000

Deepwater
Pathfinder

   ship    «      1998    10,000    30,000    Nigeria    Shell/Chevron/
Agip/Petrobras
   Jul-07    Jul-09    395,000     190,000
                  TBA    TBA    Aug-09    Dec-09    600,000     395,000
                  Ivory Coast    Lukoil    Dec-09    Feb-10    630,000     600,000

Deepwater
Horizon (15)

   semi    «      2001    10,000    30,000    USGOM    BP    Oct-07    Oct-10    See Footnote 12     278,000

Deepwater
Expedition

   ship    «      1999    10,000    30,000          Feb-08   

140 days Mob/

Contract Prep

    
                  India    Reliance    Jul-08    Aug-10    375,000     320,000

Cajun Express (15)

   semi    «      2001    8,500    25,000    USGOM    Chevron    Aug-07    Jan-10    463,000     216,000
                        Aug-08   

15 days Shipyard

or Project

    

Deepwater
Nautilus (15)

   semi       2000    8,000    30,000    USGOM    Shell    Dec-06    Dec-08    449,000     220,000
                  USGOM    Shell    Dec-08    Jan-12    535,000     449,000

GSF Explorer

   ship    «      1972/1998    7,800    30,000    Angola    BP    Jun-07    Apr-09    427,000 (15)   365,000
                  Angola    BP    Apr-09    Jul-09    450,000 (15)   427,000
                  Indonesia    Marathon-led
Consortium
   Jan-10    Jan-12    510,000     450,000

GSF Development
Driller I (15)

   semi    «      2004    7,500    37,500    USGOM    BHP Billiton    Jun-07    Jun-08    220,000     210,000
                  USGOM    BHP Billiton    Jun-08    Jul-12    510,000     220,000

GSF Development
Driller II (15)

   semi    «      2004    7,500    37,500    USGOM    BP    Nov-07    Nov-08    208,000     198,000

Sedco Energy (15)

   semi    «      2001    7,500    30,000    Nigeria    Chevron    Jan-08    Jan-11    482,000     202,000
                        Jun-08   

30 days Shipyard

or Project

    

Sedco Express (13) (15)

   semi    «      2001    7,500    30,000    Angola    BP    Jun-05    Jun-09    183,000     125,000
                                          Oct-08   

30 days Shipyard

or Project

          
Deepwater (16)                                                          

Deepwater
Navigator (14)

   ship    «      2000    7,200    25,000    Brazil    Petrobras    Mar-07    Apr-11    188,000     300,000

Discoverer 534

   ship    «      1975/1991    7,000    25,000    India    Reliance    Dec-07    Jul-10    250,000     245,000

Discoverer Seven
Seas

   ship    «      1976/1997    7,000    25,000          Feb-08   

120 days Shipyard

or Project

    
                  India    ONGC    Jun-08    Jul-11    316,000     292,000

Transocean
Marianas (15)

   semi       1979/1998    7,000    25,000    USGOM    BP    Dec-07    Jan-10    444,000     528,000

Sedco 706 (to be upgraded) (14)

   semi    «      1976/1994/
2008
   6,500    25,000          Nov-07   

400 days Shipyard

or Project

    
                        Dec-08   

80 days Mob/

Contract Prep

    
                  Brazil    Chevron    Mar-09    Apr-14    312,000     N/A

Sedco 702

   semi    «      1973/2007    6,500    25,000    Nigeria    Shell    Mar-08    Mar-11    350,000     N/A

Sedco 707 (14)

   semi    «      1976/1997    6,500    25,000    Brazil    Petrobras    Dec-05    Dec-09    188,000     N/A

GSF Celtic Sea (15)

   semi       1982/1998    5,750    25,000    USGOM    Eni    Jan-08    Jun-08    335,000     335,000

 

Page 2


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned«

 

 

Rig Type/Name

  Floater
Type
       Yr. (1)
Entered
Service
  Water
Depth
(Feet)
  Drilling
Depth
(Feet)
  Location   Client  

Current

Contract

Start/Idle

Date

 

Estimated
Expiration

/Out of

Service (2)

  Current
Contract
Dayrate (3)
(Dollars)
    Previous
Contract
Dayrate (3)
(Dollars)
                Jun-08   120 days Shipyard
or Project
   
                Oct-08   60 days Mob/
Contract Prep
   
            Brazil   British Gas   Dec-08   Dec-10   455,000  (14)   335,000

Jack Bates

  semi     1986/1997   5,400   30,000   Australia   Woodside   Jun-07   Jul-08   362,000 (24)   475,000
                Jul-08   21 days Mob/
Contract Prep
   
            Indonesia   Eni   Aug-08   Feb-09   530,000     362,000
                Feb-09   15 days Mob/
Contract Prep
   
            Australia   Hess   Mar-09   Jun-10   362,000 (24)   530,000

Sedco 709

  semi   «   1977/1999   5,000   25,000   Nigeria   Shell   Oct-06   Oct-09   205,000     175,000

M.G. Hulme, Jr.

  semi     1983/1996   5,000   25,000   Angola   Eni   Jan-08   May-08   430,000     355,000
            Nigeria   Eni   May-08   Jan-10   430,000     430,000

Transocean Richardson (13) (15)

  semi     1988   5,000   25,000   Angola   Chevron   Aug-07   Oct-10   454,000     300,000
                Jul-08   65 days Shipyard
or Project
   

Jim Cunningham (15)

  semi     1982/1995   4,600   25,000   Angola   ExxonMobil   Oct-07   Oct-08   364,000     357,000
            Angola   ExxonMobil   Oct-08   May-09   372,000     364,000

Sedco 710 (13) (14)

  semi   «   1983/2001   4,500   25,000   Brazil   Petrobras   Oct-06   Nov-10   125,000     190,000
                May-08   75 days Shipyard
or Project
   

Transocean Rather (14)

  semi     1988   4,500   25,000   UKNS   BP   Oct-07   Dec-08   254,000     304,000
            UKNS   BP   Dec-08   Sep-09   436,000     254,000

Sovereign Explorer (15)

  semi     1984   4,500   25,000   Suriname   Repsol   Apr-08   Jul-08   380,000     65,000
            Brazil   Repsol   Jul-08   May-10   382,000 (14)   65,000
                Aug-08   35 days Shipyard
or Project
   
                 

Harsh Environment (5)

                                 

Henry Goodrich (15)

  semi     1985/2007   5,000   30,000   USGOM   StatoilHydro   Jun-07   May-09   358,000     173,000

Transocean Leader (14) (15)

  semi     1987/1997   4,500   25,000   NNS   StatoilHydro   Mar-08   Apr-08   320,000     273,000
            NNS   StatoilHydro   May-08   Oct-08   340,000     320,000
            NNS   StatoilHydro   Oct-08   Oct-09   383,000     340,000
            NNS   StatoilHydro   Oct-09   Apr-12   444,000 (16)   383,000

Paul B. Loyd, Jr. (14)

  semi     1990   2,000   25,000   UKNS   BP   Mar-07   May-09   326,000     145,000

Transocean Arctic (14) (15)

  semi     1986   1,650   25,000   NNS   StatoilHydro   Jan-07   Apr-12   285,000     195,000

Polar Pioneer (14) (15)

  semi     1985   1,500   25,000   NNS   StatoilHydro   Aug-06   Feb-10   305,000     181,000
            NNS   StatoilHydro   Mar-10   Mar-14   499,000     305,000
                 

Midwater Floaters (29)

                                 

Sedco 700

  semi     1973/1997   3,600   25,000   Equatorial Guinea   Noble Energy   Mar-08   May-08   395,000     363,000
            Equatorial Guinea   Noble Energy   May-08   Jun-08   410,000     395,000

Transocean Legend

  semi     1983   3,500   25,000   China   Devon   Feb-08   Apr-08   450,000     120,000
            Sakhalin Is.   BP   Apr-08   Jan-09   405,000     450,000

Transocean Amirante (15)

  semi     1978/1997   3,500   25,000       Feb-08   105 days Shipyard
or Project
   
            USGOM   Eni   Jun-08   Apr-11   374,000     325,000

GSF Arctic I (14) (15)

  semi     1983/1996   3,400   25,000   Brazil   Shell   Mar-08   Jan-11   270,000     265,000

C. Kirk Rhein, Jr.

  semi     1976/1997   3,300   25,000   India   Reliance   Feb-07   May-09   340,000     N/A

Transocean Driller (13) (14)

  semi     1991   3,000   25,000   Brazil   Petrobras   Aug-06   Aug-10   115,000     53,000

GSF Rig 135 (15)

  semi     1983   2,400   25,000   Congo   Total   Oct-07   Dec-09   325,000     325,000
            Congo   Total   Feb-10   Jun-10   380,000     325,000

GSF Rig 140 (15)

  semi     1983   2,400   25,000   Angola   ExxonMobil   Oct-07   Oct-08   254,000 (21)   309,000
            Angola   ExxonMobil   Oct-08   Jun-09   309,000     254,000

Falcon 100 (13) (14)

  semi     1974/1999   2,400   25,000   Brazil   Petrobras   Mar-08   Apr-13   235,000     180,000

GSF Aleutian Key (15)

  semi     1976/2001   2,300   25,000   Angola   Sonangol   Nov-07   Jul-09   357,000     145,000

Istiglal (15) (20)

  semi     1995/1998   2,300   20,000   Caspian   BP   Jan-08   Jun-08   113,000     96,000
            Caspian   BP   Jun-08   Dec-08   111,000     113,000

Sedco 703

  semi     1973/1995   2,000   25,000   Australia   Woodside   Aug-07   Sep-08   435,000     400,000
                Sep-08   20 days Shipyard
or Project
   
            Australia   ConocoPhillips   Oct-08   Apr-09   450,000     435,000

Sedco 711

  semi     1982   1,800   25,000   UKNS   Shell   Nov-07   Feb-09   283,000     150,000
                Mar-08   50 Days Shipyard
or Project
   
            UKNS   Shell   Feb-09   Feb-11   385,000     283,000

Transocean John Shaw

  semi     1982   1,800   25,000   UKNS   Total   Dec-07   May-08   380,000  (14)   101,000
                Jun-08   40 Days
Shipyard or
Project
   
            UKNS   Petrofac   Jul-08   Jul-09   350,000     380,000

 

Page 3


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned«

 

 

Rig Type/Name

  Floater
Type
       Yr. (1)
Entered
Service
  Water
Depth
(Feet)
  Drilling
Depth
(Feet)
  Location   Client  

Current Contract

Start/Idle

Date

 

Estimated
Expiration

/Out of

Service (2)

  Current
Contract
Dayrate (3)
(Dollars)
    Previous
Contract
Dayrate (3)
(Dollars)

GSF Arctic III

  semi     1984   1,800   25,000       Mar-08   25 days Mob/
Contract Prep
   
                Apr-08   160 Days Shipyard
or Project
   
                Sep-08   20 days Mob/
Contract Prep
   
            Libya   Eni   Sep-08   Sep-09   453,000     350,000

Sedco 712

  semi     1983   1,600   25,000   UKNS   Oilexco   Mar-08   May-10   340,000     235,000

Sedco 714 (14)

  semi     1983/1997   1,600   25,000   UKNS   Total   Jan-08   May-08   357,000     312,000
            UKNS   Total   May-08   Jul-08   207,000     357,000
            UKNS   Total   Jul-08   Sep-08   257,000     207,000
            UKNS   Total   Sep-08   Jan-09   207,000     257,000
            UKNS   Total   Jan-09   Apr-09   257,000     207,000
            UKNS   Total   May-09   Oct-09   357,000     257,000

GSF Arctic IV (23)

  semi     1983/1999   1,500   25,000   UKNS   Shell   Sep-07   Oct-10   275,000 (15)   185,000

GSF Grand Banks (15)

  semi     1984   1,500   25,000   East
Canada
  Husky   Jan-08   Jan-11   353,000     144,000
                Aug-08   150 days Shipyard
or Project
   

Actinia

  semi     1982   1,500   25,000   India   Reliance   Sep-06   Sep-09   190,000     54,000
                Mar-08   90 days Shipyard
or Project
   

Sedco 601

  semi     1983   1,500   25,000   Malaysia   Petronas
Carigali
  Jan-08   Jan-11   255,000     268,000
                Mar-08   14 days Shipyard
or Project
   

Sedneth 701

  semi     1972/1993   1,500   25,000   Angola   Chevron   Jun-07   Jan-10   362,000     90,000

Transocean Winner (14) (15)

  semi     1983   1,500   25,000   NNS   StatoilHydro   Aug-06   Oct-09   382,000     120,000
            NNS   Lundin   Oct-09   Oct-12   453,000     382,000

Transocean Searcher (14) (15)

  semi     1983/1988   1,500   25,000   NNS   StatoilHydro   Oct-06   Jan-09   359,000     138,000
                Mar-08   60 days Shipyard
or Project
   
            NNS   StatoilHydro   Jan-09   Mar-12   411,000     359,000

Transocean Prospect

  semi     1983/1992   1,500   25,000   UKNS   CNR   Sep-06   Nov-08   206,000 (14)   98,000
            UKNS   Nexen   Nov-08   Feb-11   365,000     206,000

Dada Gorgud (15) (20)

  semi     1978/1998   1,500   25,000   Caspian   BP   Jan-08   Dec-08   105,000     90,000

J.W. McLean

  semi     1974/1996   1,250   25,000   UKNS   Shell   Jul-07   Aug-08   250,000     140,000

GSF Arctic II (23)

  semi     1982   1,200   25,000   UKNS   Talisman   Mar-08   Apr-08   365,000     380,000
            UKNS   Talisman   Apr-08   May-08   420,000     365,000
            UKNS   Lundin   May-08   Jul-08   425,000 (15)   420,000
            Ireland   Providence
Resources
  Jul-08   Oct-08   400,000     425,000

Sedco 704

  semi     1974/1993   1,000   25,000   UKNS   BP   Sep-07   Nov-08   316,000 (14)   176,000
                        UKNS   ADTI   Nov-08   Nov-09   371,000 (22)   316,000
High Specification Jackups (10)                                          

GSF Constellation I (15)

      2003   400   30,000   Trinidad   BP   Aug-07   Sep-09   219,000     76,000

GSF Constellation II (15)

      2004   400   30,000   Egypt   BP   Jun-07   Apr-10   194,000     170,000

GSF Galaxy I

      1991/2001   400   30,000   UKNS   BP   Jun-06   Apr-08   105,000     80,000
            UKNS   BP   Apr-08   Jul-08   300,000     105,000
            UKNS   BP   Jul-08   Oct-08   100,000     300,000
            UKNS   BP   Oct-08   Apr-09   115,000     100,000
            UKNS   BP   May-09   Jul-09   227,000     115,000

GSF Galaxy II

      1998   400   30,000       Mar-08   30 days Shipyard
or Project
   

GSF Galaxy III (14) (15)

      1999   400   30,000   UKNS   Nexen   Oct-07   Nov-09   113,000     100,000
                Jul-08   30 days Shipyard
or Project
   

GSF Baltic (15)

      1983   375   25,000   Nigeria   ExxonMobil   May-07   May-09   205,000     240,000

GSF Magellan (15)

      1992   350   30,000   UKNS   Shell   Sep-07   Apr-08   300,000     145,000
            UKNS   Shell   Apr-08   Oct-08   145,000     300,000
                Oct-08   35 days Shipyard

or Project

   

GSF Monarch

      1986   350   30,000   UKNS   Shell   Dec-07   Mar-09   78,000     70,000

GSF Monitor (15)

      1989   350   30,000   Trinidad   BP   Apr-07   Apr-09   151,000     70,000

Trident 20

      2000   350   25,000   Caspian   Petronas
Carigali
  Jan-06   Jan-10   130,000     90,000
                                Aug-08   14 days Shipyard

or Project

         
Standard Jackups (56)                                                         

Trident IX

      1982   400   20,000   Vietnam   JVPC   Aug-07   Sep-08   210,000     188,000
                Sep-08   80 days Shipyard

or Project

   

Trident 17

      1983   355   25,000   Malaysia   Petronas
Carigali
  Sep-07   May-10   185,000     195,000
                Mar-08   50 days Shipyard
or Project
   

 

Page 4


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned«

 

Rig Type/Name   Floater
Type
  Yr. (1)
Entered
Service
  Water
Depth

(Feet)
  Drilling
Depth

(Feet)
  Location   Client  

Current Contract

Start/Idle Date

 

Estimated
Expiration

/Out of

Service (2)

  Current
Contract
Dayrate (3)

(Dollars)
    Previous
Contract
Dayrate (3)

(Dollars)

GSF Adriatic II (15)

    1981   350   25,000   Angola   Chevron   May-07   May-09   190,000     55,000

GSF Adriatic IX (15)

    1981   350   25,000   Gabon   Total   Nov-07   Jul-08   155,000     100,000
          Gabon   Total   Jul-08   Jul-09   188,000     155,000

GSF Adriatic X

    1982   350   30,000   Egypt   Petrobel   Nov-06   Nov-08   150,000     63,000
              Nov-08   14 days Shipyard
or Project
   

GSF Key Manhattan

    1980   350   25,000   Egypt   Petrobel   Aug-07   Aug-08   155,000     136,000

GSF Key Singapore

    1982   350   25,000   Egypt   Petrobel   Jun-07   May-08   155,000     136,000
              Jul-08   35 days Shipyard
or Project
   

GSF Adriatic VI

    1981   328   25,000   Nigeria   Afren   Jan-08   Oct-08   210,000 (15)   195,000
          Gabon   Vaalco   Oct-08   Dec-08   218,000     210,000

GSF Adriatic VIII (15)

    1983   328   25,000   Nigeria   ExxonMobil   Mar-07   Mar-09   188,000     145,000

C.E. Thornton (14)

    1974   300   25,000       Feb-08   170 days Shipyard
or Project
   
          India   ONGC   Oct-08   Dec-11   150,000     45,000

D.R. Stewart

    1980   300   25,000   Italy   Eni   Apr-07   Apr-10   168,000     57,000

F.G. McClintock

    1975   300   25,000       Apr-08   170 days Shipyard
or Project
   
          India   ONGC   Oct-08   Nov-11   145,000     50,000

G.H. Galloway

    1984   300   25,000   Italy   Eni   Aug-06   Aug-08   115,000     54,000
          Italy   Eni   Aug-08   Jan-12   170,000     115,000

GSF Adriatic I (15)

    1981   300   25,000   Angola   Chevron   Apr-07   Apr-09   192,000     110,000

GSF Adriatic V (15)

    1979   300   25,000   Angola   Chevron   Mar-07   Mar-09   190,000     55,000

GSF Adriatic XI (15)

    1983   300   25,000   Vietnam   Hoang Long
JOC
  Jul-07   Jul-08   210,000     110,000
              Jul-08   14 days Shipyard
or Project
   

GSF Compact Driller (15)

    1992   300   25,000   Thailand   Chevron   Oct-07   Apr-09   196,000     186,000

GSF Galveston Key

    1978   300   25,000   Vietnam   Cuu Long JOC   Mar-08   Sep-08   178,000     147,000
          Vietnam   Cuu Long JOC   Sep-08   Mar-09   183,000     178,000
          Vietnam   Cuu Long JOC   Mar-09   Sep-09   187,000     183,000
          Vietnam   Cuu Long JOC   Sep-09   Mar-10   192,000     187,000

GSF Key Gibraltar

    1976/1996   300   25,000   Thailand   PTTEP   Oct-07   Dec-08   205,000     192,000
              Apr-08   70 days Shipyard
or Project
   

GSF Key Hawaii (15)

    1982   300   25,000   Qatar   Maersk   Jul-07   Jul-09   175,000     195,000

GSF Labrador

    1983   300   25,000   UKNS   Tullow Oil   Dec-07   Apr-08   227,000     173,000
              Apr-08   45 days Shipyard
or Project
   

GSF Main Pass I

    1982   300   25,000   Saudi Arabia   Saudi Aramco   Jul-07   Jul-11   164,000     100,000

GSF Main Pass IV

    1982   300   25,000   Saudi Arabia   Saudi Aramco   Aug-07   Jul-11   164,000     100,000

GSF Parameswara

    1983   300   20,000   Indonesia   Total   Jan-07   Jul-08   102,000     70,000
              Jul-08   50 days Shipyard
or Project
   
          Indonesia   Total   Sep-08   Feb-09   106,000     102,000

GSF Rig 134

    1982   300   20,000   Malaysia   Petronas Carigali   Apr-07   May-10   166,000     128,000

GSF Rig 136

    1982   300   20,000   Indonesia   Serica Energy   Nov-07   May-08   185,000     210,000

Harvey H. Ward

    1981   300   25,000   Vietnam   Thang Long
JOC
  Jan-08   Jun-08   122,000     110,000
          Malaysia   Talisman   Jun-08   Aug-08   110,000     122,000
              Aug-08   125 days Shipyard
or Project
   

Interocean III

    1978/1993   300   25,000   Egypt   Agiba   Jul-07   Jan-09   117,000     65,000

J.T. Angel

    1982   300   25,000   India   ONGC   Mar-07   May-10   148,000     105,000
              Oct-08   14 days Shipyard
or Project
   

Randolph Yost

    1979   300   25,000   India   ONGC   Mar-07   Mar-10   148,000     61,000

Roger W. Mowell

    1982   300   25,000   Malaysia   Talisman   Nov-06   Dec-08   110,000     48,000

Ron Tappmeyer

    1978   300   25,000   India   ONGC   Feb-07   Feb-10   148,000     62,000

Shelf Explorer

    1982   300   20,000   Vietnam   Lam Son   Dec-07   May-08   174,000     208,000
          Vietnam   Lam Son   May-08   Aug-08   184,000     174,000

Transocean Nordic

    1984   300   25,000       Oct-07   215 days Shipyard
or Project
   
          Sakhalin Island   Venineft   May-08   Oct-08   185,000     74,000
              Nov-08   150 days Shipyard
or Project
   

Trident 15

    1982   300   25,000   Thailand   Chevron   Feb-06   Feb-12   100,000 (17)   60,000
              May-07   330 days Shipyard
or Project
   

Trident 16

    1982   300   25,000   Vietnam   Petronas Carigali   Feb-08   Feb-10   189,000     195,000
          Malaysia   Petronas Carigali   Feb-10   Aug-11   180,000     189,000

Trident II

    1977/1985   300   25,000   India   ONGC   Apr-07   Jun-10   148,000     60,000

Trident IV

    1980/1999   300   25,000   Equatorial
Guinea
  Noble Energy   Mar-08   Apr-08   244,000     90,000
          Cameroon   Bowleven   Apr-08   Jun-08   219,000     244,000

 

Page 5


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned«

 

Rig Type/Name   Floater
Type
       Yr. (1)
Entered
Service
  Water
Depth

(Feet)
  Drilling
Depth

(Feet)
  Location   Client  

Current Contract

Start/Idle Date

 

Estimated
Expiration

/Out of

Service (2)

  Current
Contract
Dayrate (3)

(Dollars)
    Previous
Contract
Dayrate (3)

(Dollars)

Trident VIII

      1981   300   21,000   Nigeria   Total   Apr-06   Jun-08   66,000     56,000
                Jun-08   15 days Shipyard
or Project
   

Trident XII

      1982/1992   300   25,000   India   ONGC   Jan-07   Feb-10   148,000     62,000

Trident XIV

      1982/1994   300   20,000   Angola   Chevron   Jun-06   Jun-09   98,000     61,000

GSF High Island II

      1979   270   20,000   Saudi Arabia   Saudi Aramco   Jul-07   Jul-11   164,000     100,000

GSF High Island IV

      1980/2001   270   20,000   Saudi Arabia   Saudi Aramco   May-07   May-11   164,000     107,000

GSF High Island V

      1981   270   20,000   Gabon   Total   May-07   Jun-08   155,000     86,000
            Gabon   Total   Jun-08   Jan-09   155,000  (15)   155,000

GSF High Island IX (15)

      1983   250   20,000   Nigeria   Addax
Petroleum
  Jun-07   Jun-09   150,000     145,000
                Aug-08   14 days Shipyard
or Project
   

GSF High Island VII

      1982   250   20,000   Cameroon   Total   Feb-07   Sep-08   160,000     98,000

GSF High Island VIII (23)

      1981   250   20,000   USGOM   BHP Billiton   Jan-08   May-08   72,000     58,000

GSF Rig 103

      1974   250   20,000   See
Footnote 25
  See
Footnote 25
  See Footnote 25   See Footnote 25   See Footnote 25     170,000

GSF Rig 105

      1975   250   20,000   Egypt   Petrobel   Mar-08   Mar-11   112,000     90,000

GSF Rig 124

      1980   250   20,000   Egypt   AMAPETCO   Apr-07   Oct-08   110,000     55,000

GSF Rig 127 (15)

      1981   250   20,000   Qatar   Maersk   Jun-07   Jun-09   145,000     120,000

GSF Rig 141

      1982   250   20,000   Egypt   Petrogulf   Nov-07   Nov-08   115,000     115,000
            Egypt   Petrogulf   Nov-08   Nov-09   120,000     115,000

Transocean Comet

      1980   250   20,000   Egypt   GUPCO   Oct-07   Oct-09   112,000     62,000

Transocean Mercury

      1969/1998   250   20,000   Egypt   Petrobel   Feb-08   Jan-10   110,000     58,000

Trident VI

      1981   220   21,000   Vietnam   Vietsovpetro   Apr-07   Aug-08   193,000     142,000

GSF Britannia

          1968   200   20,000   UKNS   Shell   Aug-07   Feb-09   61,000     55,000
Swamp Barges (2)                                                         

Searex 4

      1981/1989   21   25,000   Indonesia   Total   Sep-04   Sep-09   39,000     N/A

Hibiscus (18)

          1979/1993   25   16,000   Indonesia   Total   Oct-07   Sep-12   71,500     74,000
Others (2)                                                         

Joides Resolution (15) (19)

  ship   «   1978   27,000   30,000   Singapore     Oct-06   660 days Shipyard
or Project
   
            Worldwide   TAMRF   Sep-08   Sep-13   64,500     35,000

Sedco 135D (14)

      1966/1977/
2001
  600     Brazil   SLB   Jun-01   Jun-09   33,000     N/A

Fixed-Price Options

                                             
High Specification Floaters:                                          
Ultra-Deepwater                                                         

GSF Explorer

  ship   «   1972/1998   7,800   30,000   Angola   BP   Jul-09   Oct-09   450,000     450,000
            Indonesia   Marathon-led
Consortium
  Jan-12   Jan-13   510,000     510,000

Sedco Express (13) (15)

  semi   «   2001   7,500   25,000   Angola   BP   Jul-09   Jul-10   183,000     183,000
Deepwater                                                         

Discoverer 534

  ship   «   1975/1991   7,000   25,000   India   Reliance   Jul-10   Jan-11   250,000     250,000
Harsh Environment                                                         

Henry Goodrich (15)

  semi       1985   2,000   30,000   USGOM   StatoilHydro   May-09   May-10   358,000     358,000
Midwater Floaters                                                         

Sedco 703

  semi     1973/1995   2,000   25,000   Australia   ConocoPhillips   Apr-09   May-09   450,000     450,000

Transocean Searcher (14) (15)

  semi     1983/1988   1,500   25,000   NNS   StatoilHydro   Mar-12   Sep-12   411,000     411,000

GSF Arctic II (23)

  semi       1982   1,200   25,000   Ireland   Providence
Resources
  Oct-08   Nov-08   400,000     400,000
High Specification Jackups                                                         

GSF Galaxy III (14) (15)

          1999   400   30,000   UKNS   Nexen   Nov-09   May-10   115,000     113,000
Others                                                         

Joides Resolution (15) (19)

  ship   «   1978   27,000   30,000   Worldwide   TAMRF   Oct-13   Sep-23   64,500     64,500

 

Footnotes:

(1) Dates shown are the original service date and the date of the most recent upgrade, if any.

 

Page 6


LOGO    Transocean Inc. (NYSE: RIG) Fleet Status Report

Updated: April 4, 2008

Revisions to Last Month’s Fleet Status Report Noted in Bold

Dynamically positioned«

(2) Expiration dates represent the company’s current estimate of the earliest date the contract for each rig is likely to expire. Some rigs have two or more contracts in continuation, so the last line shows the estimated earliest availability. Many contracts permit the client to extend the contract. The out of service time represents those days in 2008 where the company anticipates that a rig will be out of service and not be available to earn an operating dayrate for a period of 14 days or longer. Please refer to the “Out of Service Days (Shipyards, Mobilizations, Etc.)” section of the Cover Page for a full description.

(3) Represents the full operating dayrate, although the average dayrate over the term of the contract will be lower and could be substantially lower. Does not reflect incentive programs which are typically based on the rig’s operating performance against a performance curve. Please refer to the “Client Contract Duration and Dayrates and Risks Associated with Operations” section of the Cover Page for a description of dayrates.

(4) We have been awarded a five-year drilling contract by Chevron for the construction of an enhanced Enterprise-class drillship to be named Discoverer Clear Leader. Operations are expected to commence during the second quarter of 2009, after shipyard construction followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. During the first three years of the contract, the contract dayrate is $469,000. The dayrate for the last two years of the contract is linked to the standard West Texas Intermediate crude oil price with a floor of $40 per barrel resulting in a contract dayrate of $400,000 and a ceiling of $70 per barrel resulting in a contract dayrate of $500,000.

(5) We have been awarded a four-year drilling contract by StatoilHydro for the construction of an enhanced Enterprise-class drillship to be named Discoverer Americas. Operations are expected to commence by mid-2009, after shipyard construction followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors.

(6) We have been awarded a five-year contract by Chevron for the construction of an enhanced Enterprise-class drillship to be named Discoverer Inspiration. Operations are expected to commence during the first quarter of 2010, after shipyard construction followed by sea trials, mobilization to the U.S. Gulf of Mexico and customer acceptance. The contract commencement date is contingent on vendor performance and other factors.

(7) In September 2007 we exercised an option to construct a Gusto MSC/P 10,000 design drillship which is yet to be named. Construction of the drillship is expected to be completed in the fourth quarter of 2010. We are actively marketing the drillship.

(8) We own a 50 percent interest in this ultra-deepwater Samsung-design drillship to be named Deepwater Pacific 1 through a joint venture company with Pacific Drilling Limited. The joint venture has been awarded a four-year drilling contract with Reliance for construction of the drillship. Operations are expected to commence during the third quarter of 2009, after shipyard construction followed by sea trials, mobilization and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. During the first six months of the contract, the contract dayrate is $495,000, regardless of the duration of the remaining term of the contract. The dayrate for the remaining three and one-half years of the contract is $530,000. On or prior to October 31, 2008, the contract may be extended to five years, in which case the dayrate would be reduced to $515,000 for the remaining four and one-half years.

(9) We own a 50 percent interest in this ultra-deepwater Samsung-design drillship to be named Deepwater Pacific 2 through a joint venture company with Pacific Drilling Limited. The drillship is expected to finish construction in first quarter 2010. The joint venture is actively marketing the drillship.

(10) We have been awarded a drilling contract by BP for the construction of an enhanced Enterprise-class drillship to be named Discoverer Luanda. The rig will be owned by a joint venture in which the company owns 65 percent. The contract has an initial term of five years, but can be converted at the customer’s election by the end of July 2008 to a seven-year term. Operations are expected to commence during the third quarter of 2010, after shipyard construction followed by sea trials, mobilization to Angola and customer acceptance. The contract commencement date is contingent on vendor performance and other factors. The dayrate to be paid on a five-year contract period is $460,000, or $430,000 should the contract be converted to a seven-year term.

(11) We have been awarded a seven-year drilling contract by BP for the construction of a Keppel Fels MSC DSS 51 design semisubmersible to be named GSF Development Driller III. Operations are expected to commence by mid-2009, after shipyard construction followed by sea trials, mobilization to Angola and customer acceptance. The contract commencement date is contingent on vendor performance and other factors.

(12) Dayrate for contract period October 2007 through October 2010 to be set using a quarterly average of the stated contract dayrates on the company’s other Ultra-Deepwater, dynamically positioned rigs operating in the U.S. Gulf of Mexico. The dayrate is currently estimated to range from $452,000 beginning in March 2008 to $487,000 in October 2010.

(13)

Current contract provides for a bonus incentive opportunity not reflected in the stated current contract dayrate.

(14) Reflects the current contracted dayrate which is comprised of a foreign currency component and which could change due to foreign exchange adjustments.

(15)

Reflects the current contracted dayrate which could change due to cost escalations.

(16) Dayrate reflects a base level to be paid. The rig will receive a dayrate higher than the stated base level when utilized in a water depth of greater than 1,500 feet.

(17)

Dayrate subject to annual adjustment based on market dayrates within specific parameters.

(18) Owned by a joint venture in which the company owns an 80 percent interest. Dayrate indicated reflects 100 percent of contract rate.

(19) Operated under a management contract with the rig’s owner. The rig is currently engaged in scientific geological coring activities and is owned by an unconsolidated joint venture in which a subsidiary of the company has a 50 percent interest. The dayrate disclosed herein reflects 100 percent of the contracted rate. The company’s 50 percent interest in the joint venture’s earnings is included in other income in its consolidated statement of operations.

(20)

Operated under a management contract with the rig’s owner.

(21) On June 30, 2007, the riser for GSF Rig 135 was lost at sea when the transport vessel capsized. A newly manufactured riser that was to be shipped to GSF Rig 140 to replace GSF Rig 140’s existing riser was redirected to GSF Rig 135. Since we were obligated to provide a new riser for GSF Rig 140’s current contract, the dayrate for GSF Rig 140 was reduced by $55,000 per day until such time that we are able to replace the riser. We believe that the $55,000 dayrate reduction is covered under applicable insurance policies.

(22) For the period of time that this rig is contracted to Applied Drilling Technology International, the drilling management services division of the company’s U.K. operating subsidiary, or Applied Drilling Technology Inc., the company’s U.S. drilling management services subsidiary, accounting rules require that we eliminate the revenues and costs related to those contracts.

(23)

This rig has been designated as held for sale but is currently still under contract.

(24) The tax expense related to these contracts has been reduced due to a discrete tax event in the 4th quarter of 2007. In accordance with the terms of these contracts, the dayrate likewise has been reduced from $475,000 per day to $362,000 per day. Taken together, these changes have no effect on after-tax net income.

(25) The rig is currently mobilizing to the Gulf of Suez in fulfillment of a 450-day commitment at a dayrate of $116,000. The customer is disputing the commitment.

 

Page 7